The Inner House has refused an appeal by a woman who sought £2 million in loss of profits from solicitors who acted for her in the purchase of a Dundee shop, holding that the alleged losses fell outside the scope of the duty she had pleaded. Karen Lamb claimed that Campbell Boath solicitor Kenneth Soper failed to protect her adequately against risks connected with the absence of a completion certificate when she bought premises at 108 Seagate in 2012.

Lord Clark, delivering the opinion of the court, held that the lord ordinary had been entitled to find that Mr Soper properly advised Ms Lamb of the relevant risks and received informed instructions to proceed. The court further held that the later problems with defective development works were not losses arising from the risk against which the solicitors had undertaken to protect her.

Ms Lamb appeared as a party. A McKenzie KC, instructed by DAC Beachcroft Claims Scotland LLP, appeared for the respondents. The court comprised the Lord Justice Clerk, Lady Wise and Lord Clark.

Problems after purchase

Ms Lamb purchased the ground-floor shop for £250,000 with the intention of converting it into a beautician’s salon. At the time, three additional floors were being added to the building to create residential flats, and she understood that the ongoing works affected the shop. Her solicitors made a formal offer in July 2012 containing a condition requiring all necessary completion certificates to be exhibited before settlement. The seller’s qualified acceptance deleted that condition.

Mr Soper prepared a draft response which would have sought confirmation concerning completion, but it was not sent after discussions with Ms Lamb. The missives were concluded on 31 August 2012. Mr Soper knew that neither the shop nor the larger development would have a completion certificate before settlement. He also acted for the bank funding the purchase and told it that no certificate would be available at settlement but that an undertaking would be obtained from the seller’s solicitors to provide one within four to six weeks. No such undertaking was ultimately sought.

A completion certificate relating to the development was accepted by Dundee City Council in January 2013. However, Ms Lamb remained unable to operate her proposed business because substantial problems with the building works required further remedial work. A further building warrant was issued in June 2014 and a completion certificate for those works followed in May 2015. Ms Lamb sued the three partners of Campbell Boath, seeking £2 million for loss of profits and £60,000 for inconvenience.

The lord ordinary rejected the action after proof. Her decision turned substantially on the evidence of Ms Lamb and Mr Soper. She found Ms Lamb’s evidence unreliable, although not deliberately misleading, and accepted Mr Soper’s account as credible and reliable. Mr Soper said that he had explained the qualified acceptance, the absence of a completion certificate and the risks of proceeding without one. He had also explained that without the certificate they would not know whether the floors and supporting pillars above the shop had been constructed in accordance with building regulations.

The lord ordinary accepted that, notwithstanding those warnings, Ms Lamb instructed him to proceed in reliance on material including an architect’s letter, structural engineer’s report, a re-inspection report and local authority inspections.

Risk pleaded too narrowly

On appeal, Ms Lamb’s principal argument was that the lord ordinary had characterised the solicitors’ duty too narrowly. She contended that the risk was not confined to delay in, or absence of, a completion certificate. Rather, the solicitors should have protected her against “uncertified, incomplete, non-compliant or otherwise unresolved development works affecting the subjects”.

The Inner House rejected that attempt to broaden the case. Lord Clark said the starting point was the case actually pleaded. Ms Lamb had averred that an ordinarily competent solicitor should have considered whether completion certificates or effective undertakings could be obtained and, if they could not, considered how she could be protected against the consequences of non-completion or delay.

Her own expert had framed the duty similarly: Campbell Boath should either have retained the relevant condition in the missives, obtained some other adequate protection, or received clear and informed instructions from Ms Lamb not to insist upon protection. The court held that her pleadings did not extend to the wider risk now advanced on appeal. Problems arising from how the development works had actually been carried out were distinct from the consequences of the absence or delay of a completion certificate.

There had been no averment or evidence suggesting that reasonable skill and care would have led Mr Soper, when the missives were concluded, to know that the development had not been constructed in accordance with the building warrant or that the warrant required amendment. Lord Clark added that a completion certificate was not a guarantee of workmanship. It confirmed compliance with the relevant building warrant and regulations but did not guarantee against all “uncertified, incomplete, non-compliant or otherwise unresolved development works”.

The lord ordinary had therefore applied the correct legal approach in identifying the duty and the risk against which the solicitors were required to protect Ms Lamb.

Loss outside scope of duty

The appeal would also have failed on causation and loss even if breach of duty had been established. The lord ordinary had rejected Ms Lamb’s contention that she would not have proceeded with the purchase had the relevant risk been explained. The Inner House said those unchallenged factual findings “wholly undermined” her case on causation.

There was also no evidence that the temporary absence of the completion certificate caused her any loss. The certificate was outstanding between August 2012 and January 2013, but Ms Lamb was not then in a position to begin trading. She required planning permission for change of use and a building warrant for the salon fit-out. Planning permission was granted in October 2012, while the building warrant application was not made until December. Her own business plan anticipated approximately three months for the fit-out, meaning trading would not have started before around mid-March 2013 even if everything else had proceeded as planned.

The court therefore agreed that “the temporary absence of the completion certificate caused no real problems to the reclaimer”. It was the defective development works, and the time required to resolve them, which prevented her from trading.

Referring to Manchester Building Society v Grant Thornton UK LLP, Meadows v Khan and Hughes-Holland v BPE Solicitors, Lord Clark observed that a party in breach of duty is liable only for losses of a kind falling within the scope of that duty. Even if the pleaded breach and factual causation had been established, that would not have made the respondents liable for every foreseeable consequence of the transaction. The development-related losses claimed by Ms Lamb arose from a different risk and therefore fell outside the scope of the duty.

The court noted further difficulties with the £2 million loss-of-profits claim. Ms Lamb maintained that the premises could have been fitted out within three months for about £70,000, but the lord ordinary had found that the work would have taken longer and cost almost £200,000.

The Inner House concluded that the lord ordinary’s decision involved no error of law and that the arguments on breach of duty, causation, loss and quantum could not succeed. The reclaiming motion was refused, with all questions of expenses reserved.